Ea Nam Wind Power Dak Lak
Project name: EA NAM WIND POWER FACTORY Investor: Trung Nam Dak Lak 1 Wind Power Joint Stock Company Scale: Completed in 2021 Total capacity: 400 MW Contributing 1.1 billion kWh/year to the national electricity source. With more than 4000 employees working continuously for 240 days and nights. Location: Ea Nam Commune, Ea H’Leo District, Dak […]
400MW
Wattage
1,100 million kWh/year
Power output
Wind power No. 5 – Ninh Thuan
WIND POWER NO.5 – NINH THUAN Project name: WIND POWER NO.5 – NINH THUANScale: Power: 46.2 MW Number of turbines: 11 (4.2 MW/pillar) Estimated output: 136,281 million KWh/year The project of direct connection to the national power grid system supplying 220kV voltage through a 1,502 km long 220kV transmission line connecting from the 220kV wind […]
46.2MW
Wattage
136,281 million kWh/year
Power output
Dong Hai 1 wind power – Tra Vinh
DONG HAI WIND POWER 1 – TRA VINH Project name: DONG HAI 1 wind power – TRA VINHInvestor: Trungnam Tra Vinh 1 WP Scale: Power: 100MW Number of turbines: 25 cylinders (4MW/pillar) Power per turbine: 4MW/turbine Expected production: 365,000,000 kWh/year Location: Dong Hai Commune, Duyen Hai District, Tra Vinh Province
100MW
Wattage
365 million kWh/year
Power output
Trung Nam wind power
Project name: TRUNG NAM WIND POWER FACTORY Investor: Trung Nam Wind Power Joint Stock Company Scale:Total capacity: 151.95 MW, divided into 3 phases.Phase 1: 39.95 MW (17 turbines, 2.35 MW)Phase 2: 64MW (16 turbines, 4 MW)Phase 3: 48MW (12 turbines, 4MW) Location: Loi Hai Commune and Bac Phong Commune, Thuan Bac District, Ninh Thuan Province […]