Trung Nam wind power
Project name: TRUNG NAM WIND POWER FACTORY
Investor: Trung Nam Wind Power Joint Stock Company
Scale:
Total capacity: 151.95 MW, divided into 3 phases.
Phase 1: 39.95 MW (17 turbines, 2.35 MW)
Phase 2: 64MW (16 turbines, 4 MW)
Phase 3: 48MW (12 turbines, 4MW)
Location: Loi Hai Commune and Bac Phong Commune, Thuan Bac District, Ninh Thuan Province
Starting: August 26, 2016
Inaugurated: April 16, 2021
Technical description
- Wattage
- 151.95MW
- Power output
- kWh/year
- Location:
- Loi Hai Commune and Bac Phong Commune, Thuan Bac District, Ninh Thuan Province
- Start
- 26/08/2016
- inaugurate
- 16/04/2021