CONSTRUCTION
Krong No 3 . Hydropower Plant
KRONG NO 3 HYDROPOWER FACTORYProject name: KRONG NO 3 HYDROPOWER FACTORYInvestor: Trungnam Krong NoScale: Power: 18MW Average power output: 65 million kWh/year Reservoir area: 198.33 ha Location: Lac Duong District; Da Tong commune, Dam Rong district of Lam Dong province and Krong No commune, Lak district, Dak Lak province Began: 2010 Inaugurated: 2016
18MW
Wattage
65 million kWh
Power output
Krong No 2 Hydropower Plant
KRONG NO 2 HYDROPOWER FACTORY Project name: KRONG NO 2 HYDROPOWER FACTORY Investor: Trungnam Krong No Scale: Capacity: 30MW Average power output: 105.87 million kWh/year Reservoir area: 107.99 haLocation: Lac Duong district; Da Tong commune, Dam Rong district of Lam Dong province and Krong No commune, Lak district, Dak Lak province Starting: 2010 Inaugurated: 2016
30MW
Wattage
105.87 million kWh/year
Power output
Dong Nai 2 . Hydropower Plant
DONG NAI 2 HYDROPOWER FACTORYProject name: DONG NAI 2 HYDROPOWER FACTORYInvestor: Trungnam Power Scale: Capacity: 70MW (2 x 35MW) Average power output: 263.8 million kWh/year Reservoir area: 1,065.92 haLocation: Di Linh and Lam Ha districts, Lam Dong province Starting: 30/12/2007 Inaugurated: 16/05/2015
70MW
Wattage
263.8 million kWh/year
Power output
Trung Nam Thuan Nam Solar Power 450MW – Substation and 220/500kv Line Combined Factory
Trung Nam Thuan Nam Solar Power Plant 450MW – SUPPLY STATION AND LINE 220/500KV Project name: 450MW TRUNG NAM THUAN NAM TRUNG NAM Solar Power Plant and SUPPLY STATION PROJECT Factory scale: Capacity: 450MW Maximum power output: about 1,200,000kWh/year Area: 557ha Number of panels: more than 1,300,000 panels Range system rotates 120 degrees, automatically rotates […]
450MW
Wattage
1,200 million kWh/year
Power output
Ea Nam Wind Power Dak Lak
Project name: EA NAM WIND POWER FACTORY Investor: Trung Nam Dak Lak 1 Wind Power Joint Stock Company Scale: Completed in 2021 Total capacity: 400 MW Contributing 1.1 billion kWh/year to the national electricity source. With more than 4000 employees working continuously for 240 days and nights. Location: Ea Nam Commune, Ea H’Leo District, Dak […]
400MW
Wattage
1,100 million kWh/year
Power output
Wind power No. 5 – Ninh Thuan
WIND POWER NO.5 – NINH THUAN Project name: WIND POWER NO.5 – NINH THUANScale: Power: 46.2 MW Number of turbines: 11 (4.2 MW/pillar) Estimated output: 136,281 million KWh/year The project of direct connection to the national power grid system supplying 220kV voltage through a 1,502 km long 220kV transmission line connecting from the 220kV wind […]
46.2MW
Wattage
136,281 million kWh/year
Power output
Dong Hai 1 wind power – Tra Vinh
DONG HAI WIND POWER 1 – TRA VINH Project name: DONG HAI 1 wind power – TRA VINHInvestor: Trungnam Tra Vinh 1 WP Scale: Power: 100MW Number of turbines: 25 cylinders (4MW/pillar) Power per turbine: 4MW/turbine Expected production: 365,000,000 kWh/year Location: Dong Hai Commune, Duyen Hai District, Tra Vinh Province
100MW
Wattage
365 million kWh/year
Power output
Trung Nam Solar Power – Tra Vinh
Trungnam Tra Vinh Solar Power Investor: Trungnam Tra Vinh Solar Power Scale: Power: 140 MWac Average power output: 250 million kWh/year Area: 171.17 ha Number of panels: more than 440,000 panels Range system rotates 120 degrees, automatically rotates and adjusts to receive solar radiation Location: Dan Thanh commune, Duyen Hai town, Tra Vinh province Starting: […]
140 MWac
Wattage
250 million kWh/year
Power output
Trung Nam solar power
Project name: TRUNG NAM SOLAR POWER FACTORY Investor: Trung Nam Solar Power Joint Stock Company Scale: Power: 204MWac Maximum power output: about 450 million kWh/year Area: 264 ha Number of panels: more than 700,000 panels The rack system rotates 120 degrees, automatically rotates and adjusts to receive solar radiationLocation: Loi Hai Commune and Bac Phong […]
204MW
Wattage
450 triệu kWh/ năm
Power output